Brief Guide on Site Waste Management Plan London, UK

Brief guide on site waste management plan London audio:
Waste management solutions like Site Waste Management Plan London, UK helps to manage waste that is produced through demolition and construction projects. An SWMP will ensure that the waste produced by the site(s) is dealt with more effectively, thus reducing the significant harm that waste material has on the environment.

What is Site Waste Management Plan (SWMP)?

A Site Waste Management Plan London, UK (SWMP) is a documentation that details the amount and type of waste will be produced at a construction site and how it will be recycled, reused or disposed of. The plan is further updated during the construction process to record the management of waste.

Requirements of a Site Waste Management Plan (SWMP) in London, UK:

This information is based on the requirements set out in the Site Waste Management Plans Regulations 2008 (now repealed) to offer assistance on how an SWMP can be drawn up.
Site Waste Management Plan London, UK should be mandatorily written at the construction commencement stage but maintained during the entire project.

An SWMP should recognize the:
  • Client
  • Primary contractor
  • An individual who is accountable for dealing with waste
  • An individual who drafted the SWMP.
It should also describe the construction work proposed, including the:
  • Location of the site
  • The estimated rate of the project.
As per the SWMP Regulations, projects between £300,000 and £500,000 needed a basic SWMP; projects above £500,000 were required to have an advanced plan.

Storing the Site Waste Management Plan (SWMP):


Waste Management Companies in London, UK must know where the SWMP is kept. It is the responsibility of the principal contractor to make sure that the plan is available. Whether an individual is delivering material to the site or removing waste material, he/she will be a part of SWMP. Hence, everyone should be communicated clearly by incorporating the SWMP into the project at the concept and design stages.

How to Implement the Site Waste Management Plan (SWMP):


At all the stages of construction, SWMP provides a structure for waste delivery and disposal. The steps include:
  • Appoint a responsible person.
  • Identify the types and quantities of waste material that will be produced.
  • Evaluate waste management options.
  • Identify where and how to dispose of the waste produced.
  • Communicate the plan to everyone involved and carry out training.
  • Ensure on-site materials and waste handling is well planned.
  • Measure the quantity of waste produced.
  • Monitor the execution of the SWMP.
  • Review the success of the Site Waste Management Plan (SWMP).
Engaging Construction/Site Waste Management Plan London, UK companies will help you create a cost-effective SWMP and also ensure that all the waste is removed and much of it is recycled. 